PROJEKTA / WHAT WE DO
Exhibition stand assembly: precision through handover.
We coordinate exhibition stand logistics, installation and dismantling around venue schedules and requirements.
Tell us about your projectKey tips for exhibition stand assembly
Practical advice for preparing your project. Confirm requirements and deadlines against the official manual for your event edition, venue and location.
01 · Confirm the installation schedule and handover
Separate permitted installation hours from the agreed exhibitor handover time. Allow time for cleaning, equipment tests, product placement and final adjustments. Confirm each phase with the organiser: exhibitor access may differ from contractor access.
02 · Check build approval before mobilising the team
Agree who submits drawings, forms and technical documentation and who tracks approval. Review deadlines and confirm the required authorisations before installation starts. Depending on the exhibition and structure, calculations, material certificates or other checks may be required.
03 · Arrange passes and check protective equipment
Prepare personnel details and arrange accreditation through the organiser’s designated platform within its deadlines. Check whether safety footwear, high-visibility clothing or other equipment is required during build-up, including for exhibitors preparing their stand. An exhibition pass alone does not guarantee build-up access.
04 · Coordinate vehicles, unloading and handling
Check whether the vehicle needs accreditation or a booked unloading slot. Define the entry point, meeting point and person receiving the materials. Review unloading and handling arrangements, permitted waiting times and packaging storage; conditions vary by event and venue.
05 · Sequence the technical teams’ work
Coordinate structures, joinery, electrical work, graphics and audiovisuals so one trade does not block another. Identify an installation lead and an exhibitor contact for changes. Confirm who supplies and connects venue services and when they will be available for testing.
06 · Review the stand with the exhibitor before opening
Agree a review of finishes, cleaning, lighting, screens and demonstrations included in scope. Check that exhibitor staff can operate the installations and have a contact for issues. Record outstanding adjustments and who will resolve them, allowing time before opening.
07 · Plan dismantling and the destination of materials
Confirm when dismantling can begin and when vehicles and materials must leave. Identify items for reuse, return to the client or waste handling. Coordinate packing, storage and return transport before the exhibition ends.
Exhibition Stand Assembly
- Exhibition logistics
- Technical installation
- Team coordination
- Dismantling
Planning and logistics
We organise transport, venue access, working hours and installation sequence with technical teams.
Installation and handover
We coordinate structures, furniture, graphics, lighting and audiovisuals, checking finishes before handover.
Dismantling
We plan dismantling and return logistics according to the event requirements.
EXHIBITOR GUIDE
From design to exhibition paperwork, step by step
Is this your first exhibition? Here is how we prepare an exhibition stand, what each document is for and how you take part. Open each step for a short explanation.
You provide the brief, brand assets, event information and product requirements, and approve the agreed proposal. Projekta develops the technical work and coordinates the documentation and tasks included in the contracted service.
01Visual proposal and design approval
The exhibitor provides objectives, requirements, brand identity, booked space and an indicative budget. Projekta develops the layout and visual proposal; the client reviews and approves the design and agreed scope.
02Construction and fabrication drawings
Projekta develops dimensions, materials, joints, component details and electrical and audiovisual integration. Fabrication drawings specify joinery components; renders help visualise the result but do not replace technical drawings.
03Construction Plan: organiser review
Submission drawings show the floor plan, elevations, heights and other views requested for stand review. Projekta prepares documentation and coordinates submission within the agreed scope. The image shows a floor-plan extract. Submission does not mean approval: comments must be addressed and the required authorisation confirmed.Illustrative extract from project documentation. Not a current form for submission.
04Risk Assessment
This document records tasks, hazards, people at risk and measures to reduce risk. It reflects the actual project activities, including installation, use and dismantling as applicable. The exhibitor provides details of products, equipment and demonstrations to inform the assessment.Illustrative extract from project documentation. Not a current form for submission.
05Method Statement: how installation will be carried out
Describes the working method: venue access, unloading, installation sequence and schedule, responsibilities and safety measures. Projekta adapts it to the stand and coordinates it with the risk assessment and event requirements.Illustrative extract from project documentation. Not a current form for submission.
06Fire Safety / Construction Materials
This example combines a declaration about the reaction-to-fire classification of materials and their correct installation. Supporting declarations, certificates or test reports are supplied as required by the venue. This form does not replace that evidence. Documentation is submitted at the stage and deadline set by the organiser.Illustrative extract from project documentation. Not a current form for submission.
07Installation, checks and handover
Once required authorisations and access arrangements are in place, we coordinate transport, installation and services. Before opening, we check finishes, lighting and equipment included in the project. The exhibitor coordinates product delivery and takes part in handover to resolve final adjustments.
08Dismantling and waste management
We agree which items will be reused, returned to the client or handled as waste. The example form records the commitment to keep the work area clean and have the space checked after dismantling. Projekta coordinates the tasks included in the service and venue sign-off where required.Illustrative extract from project documentation. Not a current form for submission.
The sequence is indicative and some tasks overlap. Documentation, deadlines and approvals depend on the project, event edition, venue and location. Always check the current official manual; the organiser or venue grants the applicable approval.
Explore all services
Stand design & production
We design and produce custom exhibition stands, bringing brand identity, product displays and meeting spaces together.
02Audiovisual · AV
We integrate audiovisuals into exhibition stands and branded spaces: screens, LED solutions and presentation areas planned with the spatial design.
03 · NEWInteractive experiences and activations
Touchscreen challenges and product or service explorers for stands, retail and brand spaces.
04Woodworking
In-house furniture and joinery production for exhibition stands and interiors. We turn designs into pieces tailored to each space.
05Retail, corners & shopfitting
Design and production of stores, showrooms, pop-ups, branded corners and bespoke shopfitting.