Let's Talk

PROJEKTA / SEARCH

What are you looking for?

Search for a project, client, trade fair, city or service.

Results from Projekta’s websiteESC close

PROJEKTA / WHAT WE DO

Exhibition stand assembly: precision through handover.

We coordinate exhibition stand logistics, installation and dismantling around venue schedules and requirements.

Tell us about your project

Key tips for exhibition stand assembly

Practical advice for preparing your project. Confirm requirements and deadlines against the official manual for your event edition, venue and location.

01 · Confirm the installation schedule and handover

Separate permitted installation hours from the agreed exhibitor handover time. Allow time for cleaning, equipment tests, product placement and final adjustments. Confirm each phase with the organiser: exhibitor access may differ from contractor access.

02 · Check build approval before mobilising the team

Agree who submits drawings, forms and technical documentation and who tracks approval. Review deadlines and confirm the required authorisations before installation starts. Depending on the exhibition and structure, calculations, material certificates or other checks may be required.

03 · Arrange passes and check protective equipment

Prepare personnel details and arrange accreditation through the organiser’s designated platform within its deadlines. Check whether safety footwear, high-visibility clothing or other equipment is required during build-up, including for exhibitors preparing their stand. An exhibition pass alone does not guarantee build-up access.

04 · Coordinate vehicles, unloading and handling

Check whether the vehicle needs accreditation or a booked unloading slot. Define the entry point, meeting point and person receiving the materials. Review unloading and handling arrangements, permitted waiting times and packaging storage; conditions vary by event and venue.

05 · Sequence the technical teams’ work

Coordinate structures, joinery, electrical work, graphics and audiovisuals so one trade does not block another. Identify an installation lead and an exhibitor contact for changes. Confirm who supplies and connects venue services and when they will be available for testing.

06 · Review the stand with the exhibitor before opening

Agree a review of finishes, cleaning, lighting, screens and demonstrations included in scope. Check that exhibitor staff can operate the installations and have a contact for issues. Record outstanding adjustments and who will resolve them, allowing time before opening.

07 · Plan dismantling and the destination of materials

Confirm when dismantling can begin and when vehicles and materials must leave. Identify items for reuse, return to the client or waste handling. Coordinate packing, storage and return transport before the exhibition ends.

Exhibition Stand Assembly

  • Exhibition logistics
  • Technical installation
  • Team coordination
  • Dismantling
Team assembling a steel exhibition structure with a lifting platform

From the plan
to the show floor

We coordinate every stage of installation in line with applicable regulations.

Planning and logistics

We organise transport, venue access, working hours and installation sequence with technical teams.

Installation and handover

We coordinate structures, furniture, graphics, lighting and audiovisuals, checking finishes before handover.

Dismantling

We plan dismantling and return logistics according to the event requirements.

EXHIBITOR GUIDE

From design to exhibition paperwork, step by step

Is this your first exhibition? Here is how we prepare an exhibition stand, what each document is for and how you take part. Open each step for a short explanation.

You provide the brief, brand assets, event information and product requirements, and approve the agreed proposal. Projekta develops the technical work and coordinates the documentation and tasks included in the contracted service.

01Visual proposal and design approvalDefine the stand before production begins.

The exhibitor provides objectives, requirements, brand identity, booked space and an indicative budget. Projekta develops the layout and visual proposal; the client reviews and approves the design and agreed scope.

02Construction and fabrication drawingsTurn the design into workshop information.

Projekta develops dimensions, materials, joints, component details and electrical and audiovisual integration. Fabrication drawings specify joinery components; renders help visualise the result but do not replace technical drawings.

03Construction Plan: organiser reviewSubmit drawings for the organiser to review.Anonymised example: Construction Plan: organiser review

Submission drawings show the floor plan, elevations, heights and other views requested for stand review. Projekta prepares documentation and coordinates submission within the agreed scope. The image shows a floor-plan extract. Submission does not mean approval: comments must be addressed and the required authorisation confirmed.Illustrative extract from project documentation. Not a current form for submission.

04Risk AssessmentIdentify risks and preventive measures.Anonymised example: Risk Assessment

This document records tasks, hazards, people at risk and measures to reduce risk. It reflects the actual project activities, including installation, use and dismantling as applicable. The exhibitor provides details of products, equipment and demonstrations to inform the assessment.Illustrative extract from project documentation. Not a current form for submission.

05Method Statement: how installation will be carried outSet out access, work sequence, equipment and responsibilities.Anonymised example: Method Statement: how installation will be carried out

Describes the working method: venue access, unloading, installation sequence and schedule, responsibilities and safety measures. Projekta adapts it to the stand and coordinates it with the risk assessment and event requirements.Illustrative extract from project documentation. Not a current form for submission.

06Fire Safety / Construction MaterialsDocument materials and their correct installation.Anonymised example: Fire Safety / Construction Materials

This example combines a declaration about the reaction-to-fire classification of materials and their correct installation. Supporting declarations, certificates or test reports are supplied as required by the venue. This form does not replace that evidence. Documentation is submitted at the stage and deadline set by the organiser.Illustrative extract from project documentation. Not a current form for submission.

07Installation, checks and handoverCoordinate the teams and review the stand with you.

Once required authorisations and access arrangements are in place, we coordinate transport, installation and services. Before opening, we check finishes, lighting and equipment included in the project. The exhibitor coordinates product delivery and takes part in handover to resolve final adjustments.

08Dismantling and waste managementPlan removal and return the space clean.Anonymised example: Dismantling and waste management

We agree which items will be reused, returned to the client or handled as waste. The example form records the commitment to keep the work area clean and have the space checked after dismantling. Projekta coordinates the tasks included in the service and venue sign-off where required.Illustrative extract from project documentation. Not a current form for submission.

The sequence is indicative and some tasks overlap. Documentation, deadlines and approvals depend on the project, event edition, venue and location. Always check the current official manual; the organiser or venue grants the applicable approval.

Explore all services

Necessary: remember your choice for 180 days. Always active. This version has no first-party analytics or advertising.

A video loads only after allowing its provider and pressing play. You can withdraw permission at any time.

Cookie policy and providers (opens in a new tab)
Hi, I’m Projekta’s assistant. Shall we talk about your project?